电缆槽模具工艺生产流程
发布人:管理员   发布时间:2020-11-10

电缆槽模具在使用时需要按照一定的操作流程才能完成制作,在使用前需要检查模具的表面是否完整,只有这样才能制作出合格的表面光滑的产品,在使用的过程中不容易出现脱落损坏的情况,这样就可以不用频繁的更换,给施工方省去了不少的麻烦。
The cable trough mold needs to be made according to certain operation process when it is used. Before use, the surface of the mold needs to be checked to see if it is complete. Only in this way can qualified products with smooth surface be produced. It is not easy to fall off and damage in the process of use. In this way, it is not necessary to replace frequently, which saves the construction party a lot of trouble.

检查完成后需要将粘连的尘土清除干净,尘土会导致生产的产品的坚实度不足,很容易变形,这样就不容易对电缆槽模具进行检查。
After the inspection, the adhesive dust shall be removed. The dust will cause the product to be produced with insufficient solid degree and easy to deform, so it is not easy to check the cable.

             


清理后就需要进行将其安装,安装时需要使用螺丝进行连接,需要连接紧密,这样才能在灌料时不出现漏浆的情况,制作的产品可以正常使用,避免消耗原料而无法得到产品的情况,
After cleaning, it is necessary to install it. During installation, screws are needed to be used for connection, so as to avoid slurry leakage during filling, and the products can be used normally to avoid the situation that raw materials are consumed and products cannot be obtained,

安装后就需要进行灌料,灌料时需要将振动棒插入到原料中,方便原料中的气体排出,制作的产品中不会有很多的气泡,更少量的气泡就意味着产品的坚实度很强,可以承受很大的压力。
After installation, the material needs to be filled. When filling, the vibrator needs to be inserted into the raw material to facilitate the discharge of gas in the raw material. There will not be a lot of bubbles in the product. A smaller amount of bubbles means that the product has strong firmness and can withstand a lot of pressure.

 